Update November 9, 2004
Last of the Heavy Work

Above and below: November 7: The electrical conduit trench is 24" deep to allow flexibility in landscaping. The cables for the two 20-amp circuits will be completely enclosed in the conduit that is visible at left (and that is now complete and buried at the bottom of the trench.)

November 9: The privacy lattice hides the foundation. Remaining Work: Build an entry step; install wiring; install a couple of shelves and some mahogany accents; install Astropier and Milburn Wedge; install carpet; install telescope. Wait for a clear night.

Next Page: The Telescope is In the Observatory!